Terra Tunnel 2: Update

21.06.2018

Construction of both above and below ground constructions sites is underway.  The above ground camp, led by Ambassador Dagger, is being surveyed for the construction of warehouses, cranes, stables, watchtowers and war-camp space. Underground, Master Muriel is hard at work on clearing the first portion of the obstructions. Both projects are under the overall leadership of Lord Stordan von Zackenberg. 

A recent list of leadership has been posted before the Zackenberg pavilion on a hill near the Terra Tunnel Entrance:

https://discord.gg/tNt9tb

Aufgabenteilung:

Gesamtleitung und Verantwortlicher: Stordan von Zackenberg

Tunnelbau untererdisch - Leitung: Muriel Brilliantherz von den Zottelbärten von den Karfunkelsuchern

Baustelle obererdisch - Leitung: Ambassador Dagger of Blackwood und Emirah bint Gadah bint Amirah Al Shatt als Stellvertreter.

Verbindungsmann der beiden Baustellen: Adalbert Klingengießer

Transport - Leitung: Kutschergilde, zusammen mit der Landhanse

Materialverwaltung und Kasse - Leitung: Helge Damotil - Trossmeisterei

Lazarett und Heilung: Jenna Andersin von Dornetal

Sicherheit der Malaka're - Leitung: Ritter Marcus Tullius von der Löwengarde (Erster Ritter des Reichs der Rosen) und The Dame (Die Ritterin) Avaline of Sagara. Unterstützt durch Viktor, Knappe von Sir Lion von Eisenforst, Herr des Krongutes Tiefenwacht und den Mannen der Leuenwacht

Recently, however, Ambassador Dagger’s request for an extra team of tradesmen from the Hansa has been denied by the Trossmeisterei on account of a hiring freeze ordered by Lord Zackenberg.  This means Zackenberg has blocked Dagger’s own contracted resources during a mission of grave importance.  Time will tell how this fares for the Embassy, East Blackwood Company, and Mythodea.